Patches Embroidered Up to 100%

Product Description:
- Production time is 3-4 weeks.
- Rush service is available.
- Call for details.
- 100% Thread Coverage
4PV
QTY | 100 | 250 | 500 | 1000 | Set Up |
2" | 2.40 | 1.90 | 1.50 | 1.20 | 60.00 |
2-1/2" | 3.00 | 2.50 | 2.00 | 1.60 | 60.00 |
3" | 3.60 | 3.00 | 2.50 | 2.20 | 70.00 |
3-1/2" | 4.50 | 3.80 | 3.20 | 3.00 | 70.00 |
4" | 5.40 | 4.80 | 4.10 | 3.60 | 80.00 |